BT0015: Mary Rice Building Extension
Buletine recente
  • 16th mai 2024, REMINDER: PRESTART MEETING FRIDAY 17/05/24 7AM ALL MUST ATTEND

    Silica waste management

    Anexe :
    Record of Toolbox Silica Dust Mangement.pdf
  • 15th iunie 2023, Silica Management - Bryant Sites

    Please below the requiments when working with silica on Bryant sites.
    All subcontractors are required to comply with the below:
    • M or H class vacuums, local exhaust ventilation, and on-tool-dust-extractors must be used.
    • M or H class vacuums and other tools, used as a control for silica dust management, must be serviced regularly as per manufacturers recommendations.
    • Face fit respiratory protection must be used if ANY silica dust is present while conducting tasks, regardless of other controls in use.
    • Working with respirable crystalline silica dust is considered a HIGH-RISK activity, therefore, SWMS must be specific for each task that could possibly expose workers to RSC dust.
    • A SWMS that only refers to the Code or Appendix 4 in the Code will NOT be compliant and will be rejected in Hammertech.
    • Ensure the hierarchy of control has been used in the control selection of the SWMS.
    • Ensure exclusion zones, with visible signage, are erected when working with RCS.
    • All workers on site are required to perform regular cleans to ensure no silica dust is left on site.
    • Dust control plans are required if working with materials containing more than 1% silica.

    Bryant, as we are sure you do as well, want to ensure no one on site is exposed to RCS and we also want to work with all our subcontractors to ensure we are all compliant.

    If you would like further information regarding the management of silica dust you can request a copy of the Bryant Managing Silica Dust Presentation from the site supervisor or Bryant HSEQ.

    Anexe :
    Silica Bulletin Attachment.pdf
Prognoza meteo șantier
Condiții meteo curente la șantier

Ultima actualizare la: 02:21
Temperatură: 20C (Aplicație 19C)
Viteza vântului: 20KMH
Max. Vânt: 20KMH @02:21
Ploaie de la 9 AM: 0,0mm
Temp min: 20C @02:17
Temp max: 26C @14:44 03.12.2024
Rafală: 22KMH
Rafală max: 22KMH @02:21


Observație obținută de la - Bureau of Meteorology
Locație observație - Toowoomba, QUEENSLAND
Fus orar - Ora standard a Australiei Orientale
Prognoză - miercuri, 4 decembrie

Possible shower.
Min: 20C Max: 29C
Șanse de ploaie: 40%
Precipitații așteptate: 0 la 1mm


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Toowoomba, QUEENSLAND
Fus orar - Ora standard a Australiei Orientale
Mâine - joi, 5 decembrie

Partly cloudy.
Min: 17C Max: 29C
Șanse de ploaie: 20%


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea