BT0032: Toowoomba TAFE – Plumbing Tower
近期公告
  • 30th 一月 2026, Subcontractor Work Zones and HSEQ Requirements

    Subcontractor Work Zones
    The attachment outlines the Subcontractor Work Zones for the week of 02.02.2026 to 06.02.2026

    Hydration
    As we are still in the warmer months maintaining body hydration is important. It is recommended to consume at least 5-6 litres of water daily depending on the level of physical activity performed.

    Drug and Alcohol Testing
    It is the intention of Bryant Building Contractors to commence Drug and Alcohol testing on our projects. Testing will be conducted randomly, post incident and on suspicion of a person being under the influence of alcohol or illegal drugs.

    Scaffold Campaign
    In association with Scaffolding Association Australia Bryant will be running a campaign to eliminate tampering of scaffold by workers other than the licensed scaffold on site. Watch this space.

    附件 :
    2026.02.02 - Work Zones A3.pdf
现场天气预报
当前现场天气

最近更新: 15:21
温度: 26C (应用程序 24C)
风速: 17KMH
最大 风: 35KMH @0:21
自上午9点开始降雨: 0.0mm
最低温度: 15C @1:50
最高温度: 28C @14:38
阵风: 20KMH
最大风力: 43KMH @7:21


观测信息来自 - Bureau of Meteorology
观测位置 - Toowoomba、QUEENSLAND
时区 - 澳大利亚东部标准时间
预测 - 星期三、4 二月

Sunny.
最低: 15C 最大: 30C
可能有雨。: 5%


预测信息来自 - Bureau of Meteorology
预测位置 - Toowoomba、QUEENSLAND
时区 - 澳大利亚东部标准时间
明天 - 星期四, 5 二月

Mostly sunny.
最低: 16C 最大: 30C
可能有雨。: 5%


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

;