BS0013: Bells Creek Central Substation
Bollettini recenti
  • 15th giugno 2023, Silica Management - Bryant Sites

    Please below the requiments when working with silica on Bryant sites.
    All subcontractors are required to comply with the below:
    • M or H class vacuums, local exhaust ventilation, and on-tool-dust-extractors must be used.
    • M or H class vacuums and other tools, used as a control for silica dust management, must be serviced regularly as per manufacturers recommendations.
    • Face fit respiratory protection must be used if ANY silica dust is present while conducting tasks, regardless of other controls in use.
    • Working with respirable crystalline silica dust is considered a HIGH-RISK activity, therefore, SWMS must be specific for each task that could possibly expose workers to RSC dust.
    • A SWMS that only refers to the Code or Appendix 4 in the Code will NOT be compliant and will be rejected in Hammertech.
    • Ensure the hierarchy of control has been used in the control selection of the SWMS.
    • Ensure exclusion zones, with visible signage, are erected when working with RCS.
    • All workers on site are required to perform regular cleans to ensure no silica dust is left on site.
    • Dust control plans are required if working with materials containing more than 1% silica.

    Bryant, as we are sure you do as well, want to ensure no one on site is exposed to RCS and we also want to work with all our subcontractors to ensure we are all compliant.

    If you would like further information regarding the management of silica dust you can request a copy of the Bryant Managing Silica Dust Presentation from the site supervisor or Bryant HSEQ.

    Allegati :
    Silica Bulletin Attachment.pdf
Previsioni meteo del cantiere
Meteo attuale del cantiere

Ultimo aggiornamento su: 05:11
Temperatura: 10C (App 10C)
Velocità del vento: 0KMH
Max. Vento: 6KMH @01:21
Pioggia dalle 9.00: 0,0mm
Temp min: 10C @05:10
Temp max: 22C @14:55 16/09/2024
Raffica: 0KMH
Raffiche max: 6KMH @01:21


Osservazione proveniente da - Bureau of Meteorology
Luogo di osservazione - Beerburrum, QUEENSLAND
Fuso orario - Ora standard dell’Australia orientale
Previsioni - martedì, 17 settembre

Partly cloudy.
Min: 11C Max: 25C
Possibilità di pioggia: 20%


Previsioni provenienti da - Bureau of Meteorology
Luogo previsioni - Nambour, QUEENSLAND
Fuso orario - Ora standard dell’Australia orientale
Domani - mercoledì, 18 settembre

Sunny.
Min: 13C Max: 29C
Possibilità di pioggia: 10%


Documenti importanti per il cantiere
Nuovo sul cantiere?

Conosci i requisiti dei DPI per questo cantiere?

Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.

Visualizza requisiti DPI del cantiere

Inizia a lavorare prima quando arrivi sul cantiere.

Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.

Inizio registrazione

Nuovo sul cantiere?

Conosci i requisiti dei DPI per questo cantiere?

Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.

Visualizza requisiti DPI del cantiere

Nuovo sul cantiere?

Inizia a lavorare prima quando arrivi sul cantiere.

Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.

Inizio registrazione