BR0001: NDIS 111 High St, Berserker
Nylige bulletiner
  • 15th juni 2023, Silica Management - Bryant Sites

    Please below the requiments when working with silica on Bryant sites.
    All subcontractors are required to comply with the below:
    • M or H class vacuums, local exhaust ventilation, and on-tool-dust-extractors must be used.
    • M or H class vacuums and other tools, used as a control for silica dust management, must be serviced regularly as per manufacturers recommendations.
    • Face fit respiratory protection must be used if ANY silica dust is present while conducting tasks, regardless of other controls in use.
    • Working with respirable crystalline silica dust is considered a HIGH-RISK activity, therefore, SWMS must be specific for each task that could possibly expose workers to RSC dust.
    • A SWMS that only refers to the Code or Appendix 4 in the Code will NOT be compliant and will be rejected in Hammertech.
    • Ensure the hierarchy of control has been used in the control selection of the SWMS.
    • Ensure exclusion zones, with visible signage, are erected when working with RCS.
    • All workers on site are required to perform regular cleans to ensure no silica dust is left on site.
    • Dust control plans are required if working with materials containing more than 1% silica.

    Bryant, as we are sure you do as well, want to ensure no one on site is exposed to RCS and we also want to work with all our subcontractors to ensure we are all compliant.

    If you would like further information regarding the management of silica dust you can request a copy of the Bryant Managing Silica Dust Presentation from the site supervisor or Bryant HSEQ.

    Tillegg :
    Silica Bulletin Attachment.pdf
Nettstedets værmelding
Vær på anleggsted

Sist oppdatert kl.: 17:21
Temperatur: 27C (App 25C)
Vindfart: 24KMH
Maks. Vind: 26KMH @13:21
Regn side 09.00: 0,0mm
Min. temperatur: 21C @05:04
Maks. temperatur: 30C @13:49
Vindkast: 35KMH
Maks. vindkast: 35KMH @17:21


Observasjon hentet fra - Bureau of Meteorology
Observasjonssted - Rockhampton, QUEENSLAND
Tidssone - austaustralsk standardtid
Værmelding – laurdag, 23 november

Partly cloudy.
Min.: 21C Maks.: 31C
Sjanse for regn: 30%
Forventet nedbør: 0 til 1mm


Værmelding hentet fra – Bureau of Meteorology
Sted for værmelding – Rockhampton, QUEENSLAND
Tidssone - austaustralsk standardtid
I morgen - søndag, 24 november

Partly cloudy.
Min.: 21C Maks.: 31C
Sjanse for regn: 30%
Forventet nedbør: 0 til 1mm


Viktige dokumenter for anleggsplassen
Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering

Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Ny på anleggsplassen?

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering